18.2MWe Surplus new SIEMENS ELIN Turbine Combined cycle power plant [x1] HFO or Natural gas 2005y 6300V

18.2MWe Surplus new SIEMENS ELIN Turbine Combined cycle power plant [x1] HFO or Natural gas 2005y 6300V
18.2MWe Surplus new SIEMENS ELIN Turbine Combined cycle power plant [x1] HFO or Natural gas 2005y 6300V 18.2MWe Surplus new SIEMENS ELIN Turbine Combined cycle power plant [x1] HFO or Natural gas 2005y 6300V 18.2MWe Surplus new SIEMENS ELIN Turbine Combined cycle power plant [x1] HFO or Natural gas 2005y 6300V 18.2MWe Surplus new SIEMENS ELIN Turbine Combined cycle power plant [x1] HFO or Natural gas 2005y 6300V 18.2MWe Surplus new SIEMENS ELIN Turbine Combined cycle power plant [x1] HFO or Natural gas 2005y 6300V 18.2MWe Surplus new SIEMENS ELIN Turbine Combined cycle power plant [x1] HFO or Natural gas 2005y 6300V 18.2MWe Surplus new SIEMENS ELIN Turbine Combined cycle power plant [x1] HFO or Natural gas 2005y 6300V
Brand: SIEMENS ELIN
Asset Reference: RUSOFFER-030
PRICE
USD 7 800 000
QUANTITY: 1
The scope of supply of the Combined cycle steam-electric power plant as it was specified by the Owner of the asset:
 
1. SIEMENS Steam Turbine HNG 32/32– 1 PC
2. ELIN Generator НТМ-110D04 18.4 MWe – 1 PC
3. SIBENERGOMASH-BKZ Steam boiler E-100-13.8-540TМ G=100MT/h each– 2 PCS
4. JURBY WATERTECH System of chemical water treatment and demineralizer unit G=150 MT/h
5. Laboratory unit and laboratory ancillary equipment
6. Chemical reagents for water treatment and laboratory
7. YOKOGAWA Control system for boilers and turbine generator operation
8. Cleaning system of equipment
9. Auxiliary equipment:
9.1. Feed pumps
9.2. Pumps of the desalinated water
9.3. Recirculation pump
9.4. Deaerators
9.5. Heaters of the desalinated water
9.6. Feedwater heaters
9.7. Drainage tank and pumps
9.8. Desalted water storage tanks
9.9. Pipeline accessories: a lot of different types of valves
9.10. Other auxiliaries of  electro technical equipment
 
Drawings and all project documentation of the power plant are available in Russian language only as they were fulfilled by the Engineering Company in Russia.  
Supposed essential terms of the sale purchase contract and the structure of the deal:
The contracting of the asset with the USD, EUR or RUB currency of payment will be arranged by RUSOFFERS traders team directly between the Owner of the asset as the authorized Seller- Exporter of the asset in Russia and the Buyer of the asset as the Importer of the asset.
 
The supposed terms of the sale-purchase contract according INCOTERMS 2010 rules are EXW Cleared for EXPORT, on-site Owner’s yard in Russia terms. 
 
The supposed place of delivery where the asset should be collected by the Project Cargo Carrier nominated by the Buyer is the Owner’s yard located in the Center Federal District of Russia, ~2500 km far from any sea port.
 
The ownership for the asset and all risks will be passed from the Seller to the Buyer at the moment when the Project Cargo Carrier will load the asset on the Carrier’s truck.
 
The essential terms and the procedure of the assignment clause:
The asset is supposed to be passed at the Buyer’s disposal (or the Buyer’s nominated Project Carrier) in a reasonable agreed time after issuing the payment from the Buyer’s side. 
The asset must be collected by the Buyer (or the Buyer’s nominated Project Carrier) from the Seller’s yard in a reasonable agreed time specified in the sale contract.
The arrangement of the asset relocation (including if it is needed packaging, marking, painting, loading and etc) from the Seller’s place of asset location to the final destination place of delivery is supposed to be arranged by the Buyer technical team (or by the Buyer’s nominated Project Cargo Carrier or Sub-contractor under supervision of the Buyer’s representative).
 
The essential terms and procedure for payment of the asset:
The asset is expected to be paid by the Buyer before the Seller should transfer the asset at Buyer’s (or nominated Project Carrier) disposal:
-100% payment of the contract amount by bank transfer in the Owner favour (GAZPROM PLC affiliated company) against the advanced payment guarantee issued by the Owner’s Bank in Russia.
-100% payment by the Buyer’s nominated Project Cargo Carrier or authorized agent/representative of that Project Carrier in Russia at the moment of the asset loading on Carrier’s truck is option which must be agreed and confirmed by Seller, Buyer and Carrier before the deal arrangement.
- other methods of payment offered by the proposed Buyer maybe subject of negotiations.
Equipment Status: The asset is surplus new, first-handed, never been installed before in full complete condition and out of manufacturer’s warranty.  
 
Brief Operating History: The all equipment was manufactured in 2005, it was never been installed and was not in operation until nowadays. All main equipment of the asset and its auxiliaries, accessories are stored in the manufacturer’s wooden boxes in the Owner’s  warehouse. The asset is ready for shipping and relocation immediately.
Total operating hours of the turbine and generator : 0 hours since new.
The Owner of the asset will not participate in any kind of bidding or tenders arranged by the Buyer for purchase of the asset.
 
The quoted price for the whole asset with all ancillaries, accessories included is based on  EXW CLEARED FOR EXPORT, RUSSIA "AS IS WHERE IS" terms INCOTERMS-2010.
 
Partial shipments and partial sales of some units of the asset are not allowed or will not change the price.
 
Due to instructions provided the Company Owner of the asset prefers if the sale deal of the power planr will have take a place with proposed Company Buyer which had 3+ years of successful experience with power plants in any of following fields in the country of supposed destination:
- Designing and Engineering;
- Procurement and Construction;
- Relocation, Installation and Commissioning;
- Operation and Maintenance.
 
Proposed Customers who would like to negotiate with the Owner of the asset any questions concerning with pre-purchase inspection arrangement, offered price ideas for the asset, offered payment method, terms and conditions of the contract, technical information of the asset or any other offerings can do it as soon as they confirm specified here essential terms of the sale-purchase contract or submit the letter of interest in a  purchase of the asset from maintenance, installation, commissioning  service provider of SIEMENS turbines or EPC-contractors which had confirmed successful experience of turnkey  erection of combined cycle power plants with similar turbines.

 

For RUSOFFER-030 related questions and requests, contact 
Mr. Yuriy V, RUSOFFERS Trader
T: +7.918.168.16.11 VIBER WhatsApp Online
E-mail: contact @ RUSOFFERS.com
SKYPE: RUSOFFERS
RUSOFFER-030 18.2MWe Surplus new SIEMENS HNG 3232 backpressure turbine ELIN generator HTM110D04 Combined cycle steam-electric power plant [23000 kVA x 1]  HFO or Natural gas 2005y 6300V 50Hz 1500rpm Never been installed Complex of all ancillary equipment included Stored in OEM boxes Running 0 hours Sale EXW Russia
 
Inlet steam pressure and temperature generated by SIBENERGOMASH-BKZ boilers N1 and N2 rated at: 138 Bar and 540 °C
Inlet steam flow rated: 140 MT/h
Siemens turbine rated speed: 9587 rpm
Output power rating: 18200 kWe
Backpressure steam pressure and temperature generated by SIEMENS turbine: 16 Bar and 255 °C
Outlet steam flows rated: 
N1- 63 MT/h of steam with 16 Bar and 255 °C for own technological needs of demineralizer unit operation
N2- 82 MT/h of steam with 16 Bar and 255 °C for main process of ethylene, propylene production 
N3- 55 MT/h of steam with 138 Bar and 540 °C for main process of ethylene, propylene production
Fuel: HFO or Natural gas
HFO consuming capacity: 15 MT/h
Natural gas consuming capacity: 10000 NM3/h
The projected mode of turbine and generator operation for power generation is permanent 8000 hrs during a year.
 
In addition to the production of superheated steam the water treatment unit is designed to produce 150 MT/h of chemically demineralized, desalted water for the needs of the plant.
Offer's type sale
Type of asset power plant
Brand of asset SIEMENS ELIN
Country of origin Germany
Fuel natural gas or HFO
Status surplus unused
Condition dismantling and packaging not required
Year of manufacture 2005
Running hours 0
Total electrical output of asset, MWe 18.200
Quantity of power generating units, pieces 1
Alternator output or Power rating of power generating unit, kWe 18200
Generator voltage, V 6300
Nominal frequency, Hz 50
Speed engine, RPM 1500
Brand and model of power generating asset or Engine type SIEMENS HNG 3232
Brand and model of alternator, kVA Rating ELIN HTM110D04 23000 kVA