3MNM3/day Surplus new Complex Natural gas treatment plant Low temperature separation 2001y

3MNM3/day Surplus new Complex Natural gas treatment plant Low temperature separation 2001y
3MNM3/day Surplus new Complex Natural gas treatment plant Low temperature separation 2001y 3MNM3/day Surplus new Complex Natural gas treatment plant Low temperature separation 2001y 3MNM3/day Surplus new Complex Natural gas treatment plant Low temperature separation 2001y 3MNM3/day Surplus new Complex Natural gas treatment plant Low temperature separation 2001y 3MNM3/day Surplus new Complex Natural gas treatment plant Low temperature separation 2001y 3MNM3/day Surplus new Complex Natural gas treatment plant Low temperature separation 2001y
Brand: DKG EAST
Asset Reference: RUSOFFER-004
PRICE
USD 2 800 000
QUANTITY: 1
The Complex Natural Gas Treatment Plant scope of supply as it was specified by the Owner of the asset - Oil and Gas Exploration Company consists of:
 
1 Air Cooling Module (for natural gas cooling )
1 Water and Methanol Degassers Module
1 Pumping Module for Methanol injection 
1 Low temperature Separator Module
1 Primary Separator Module with a Column blowing methanol
1 Intermediate Separator Module
2 Splitter Modules
1 Methanol fuel Filters Module
1 Ejectors Module
2 Heat Exchangers Gas-Gas
1 Heat Exchanger Gas-Condensate
2 Gas and condensate Heaters
 
The estimated shipping weight of the whole asset is ~ 350 000 kg.
 
Supposed essential terms of the sale purchase contract and the structure of the deal:
 
The signing of a contract for sale of the asset with the USD, EUR or RUB currency of payment will be arranged by RUSOFFERS traders team directly between the Owner of the asset as the authorized Seller and Exporter of the asset and the Buyer of the asset as the Importer of the asset.
 
The supposed basis terms of the sale-purchase contract according INCOTERMS 2010 rules are EXW Cleared for EXPORT, on-site Owner’s warehouse terms. 
 
The supposed place of delivery where the asset should be collected by the Project Carrier nominated by the Buyer is the warehouse of the Owner of the asset located in the Siberian Federal District of Russia, ~4000 km far from any sea port in Russia.
 
The ownership for the asset and all risks will be passed from the Seller to the Buyer at the moment when the Project Cargo Carrier will load the asset on the Carrier’s truck.
 
The essential terms and the procedure of the assignment clause:
The asset is supposed to be passed at the Buyer’s disposal (or the Buyer’s nominated Project Carrier) in a reasonable agreed time after issuing the payment from the Buyer’s side. 
The asset must be collected by the Buyer (or the Buyer’s nominated Project Carrier) from the Seller in a reasonable agreed time specified in the sale contract.
The arrangement of the asset relocation (including packaging, marking, painting, loading and etc) from the Seller’s place of asset location to the final destination place of delivery is supposed to be arranged by the Buyer's technical team (or by the Buyer’s appointed Project Cargo Carrier).
 
If the Buyer needs and upon additional Buyer’s request the mentioned complex of services can be provided by an experienced Contractor or Project Cargo Carrier of such kind services in Russia that can be proposed to the Buyer by RUSOFFERS Co. .
 
The essential terms and procedure for payment of the asset:
The asset is expected to be paid by the Buyer before the Seller should transfer the asset at Buyer’s (or nominated Project Carrier) disposal by any of the following options:
-100% payment bank transfer against APG issued by the Owner of the asset;
-100% covered irrevocable documentary letter of credit issued  to the Seller's bank or confirmed by the Seller’s bank if the L/C is not covered with condition of payment against copy of shipping document: either deed of conveyance of the asset signed and stamped by the Seller and Buyer or  CMR, loading report issued by the Buyer’s nominated Project Carrier and confirming the acceptance of the asset by that Carrier.
Equipment Status: The asset is unused, first-handed, never been installed and out of manufacturer’s warranty.  As the asset is being offered for sale in condition  “as is and where is” from long-terms storage pre-purchase inspection of the asset is recommended for technical team of proposed end-users of the asset to evaluate the quality and condition of the asset.
 
Brief Operating History: The natural gas treatment plant was manufactured in 2000 - 2001, delivered in Russia in 2002, have not been installed and never been in operation at all. Total operating hours are 0 (Zero) hours since new. 
All technical documentation regarding to the plant line is available from the Owner in Russian language only as the asset was designed for application by Russian oil and gas exploration Company.
For a moment the Owner keeps the asset stored on the own open yard under sky.
The Owner of the asset will not participate in any kind of bidding or tenders arranged by the Buyer for the purchase of the asset.
 
Partial shipments and partial sales of the asset are allowed but must be agreed upon a request .
 
Potential Customers who would like to negotiate with the Owner of the asset any points concerning with pre-purchase inspection arrangement, offered price ideas for the asset, terms and conditions of the contract or any other offerings can do it as soon as they confirm specified essential terms of the sale contract and provide RUSOFFERS traders team with guaranteed confirmation to contract the asset with provided terms and conditions.
 
Due to the far place of the asset’s storage (natural gas field) June – September months are preferable period of time for shipping arrangement.
For RUSOFFER-004 
related questions and requests, please contact :
Mr. Yuriy V Ok-ov, RUSOFFERS Co Trader
T: +7.913.88.003.88 VIBER WhatsApp Online
E-mail: contact@  RUSOFFERS.com
SKYPE: RUSOFFERS
 

RUSOFFER-004 3MNM3/day Output capacity DKG EAST – OT INDUSTRIES Unused Pre-owned Complex Natural gas treatment plant Low temperature separation Methanol injection 110bar Inlet Gas pressure 2001y 09G2S steel grade Long-term storage Never been Installed EXW Russia

 

Offer's type sale
Name of asset treatment plant
Size [х Quantity] see in scope of supply
Type of asset treatment plant
Brand of asset DKG EAST
Category of asset Natural Gas Pretreatment
Application natural gas
Country of origin Hungary
Status unused
Condition dismantling and packaging not required
Year of manufacture 2001
Asset’s weight 300 000
Manufacturer’s Docs availability Available
Model Grade 3MNM3/day O9G2S
Partial shipments Allowed upon request
Standard specification Russian GOST